Temple II CCGT Power Plant
Temple II Power Plant is a clean natural gas-fueled, 755-megawatt combined-cycle facility connected to ERCOT grid system, 1 gas storage tank and 1 shared inventory with Temple I Power Plant. Temple II Power Plant can supply the power needs of up to 750,000 homes and should infuse approximately $1.6 billion into the Central Texas economy.
Location
Synergy Industrial Park in Temple, Texas
Site Size
250 Acres
Size
755 Megawatts Installed Capacity
Technology
Combined Cycle Gas Turbine
Fuel
Natural Gas
Air Permit Received
October 2008
Construction Start
April 2013
Construction Time
28 Months
Commercial Operation
August 2015
Temple I CCGT Power Plant
Temple I Power Plant is a clean natural gas-fueled, 768-megawatt combined-cycle facility connected to ERCOT grid system, 1 gas storage tank and 1 shared inventory with Temple II Power Plant. The Temple I Power Plant can supply the power needs of up to 750,000 homes and should infuse approximately $1.6 billion into the Central Texas economy.
Location
Synergy Industrial Park in Temple, Texas
Site Size
250 Acres
Size
768 Megawatts Installed Capacity
Technology
Combined Cycle Gas Turbine
Fuel
Natural Gas
Air Permit Received
October 2008
Construction Start
July 2012
Construction Time
24 Months
Commercial Operation
July 2014